The site is surrounded by 3 main high-rise buildings. Karat Business Center is placed opposite the existing entrance, the Golden Pay LLC building is on the south of the site and Caspian Palace Hotel is on the East. The building is perceived well from the overpass main road Bakixanıv Street. Our site is offset from the main road with a park buffer zone.
The main entrances of the campus will be achieved through Murtuza Muxtarov Street. The perspective of the entrance street is amplified by the existing historical buildings and their facades. We can create a balance to the opposite side on our land by preserving the historical facade of the existing building of the existing campus.
The Campus is perceived widely from the north side which is the lower-level city perspective. The green parc zone in front of the building connects with the other green zones of the city creating a very wide city perspective. The secondary courtyard that we can create in the south side of the campus is a smaller perspective with a smaller historical angle and approach.
There are two existing historic buildings on the site. These are not by the local codes required to preserve. The interior of the buildings is in poor condition and probably not suitable to use. But in order to preserve the urban memory and the city facade texture, we can just preserve the facades of the two buildings and place the new buildings behind the historical facades.